Identity and stakeholders
Total’s June 2012 announcement places Halfaya southeast of Amara in Missan governorate. It identifies PetroChina as the consortium operator, with Total, Petronas and the Iraqi state partner, and records the development and production service contract with Missan Oil Company. These are dated contractual observations, not a newly verified 2026 shareholding schedule. H1
The current PetroChina Halfaya company-profile search extract also identifies PetroChina as operator. The full page could not be retrieved in this check, so no current ownership percentages are presented as verified. H4
Oil and gas milestones are different
The 2012 partner announcement described production from newly built facilities as a development milestone. PetroChina’s 2024 annual results separately record the Halfaya gas-processing plant entering production during that reporting year. The latter supports a gas-utilisation milestone; it does not establish that every associated-gas objective has been achieved. H1 · H2
A CNPC Halfaya report published on 16 June 2026 stated that combined oil and gas output exceeded 21 million tonnes of oil-equivalent in 2025. This retained historical operator report does not establish a current daily crude-oil rate. Fresh retrieval of the original page timed out on 22 November 2026. H3
Practical reading for project teams
Separate three questions: whether the facility has started, how much it is processing during a stated period, and which further works are formally contracted. Start-up evidence answers only the first question. Do not turn a commissioned plant into an implied invitation to supply chemicals, equipment or services.
For any real requirement, reconcile the buyer’s scope with the correct oil or gas facility, its document standards and the actual delivery interface. Technical qualification, import readiness and commercial terms remain specific to the intended package. The existence of this field dossier implies no ASHUR supplier appointment or relationship with the named companies.
Questions before acting
- Is the proposed scope tied to oil production, gas treatment or a shared utility?
- Is an output figure oil-only, gas-only or combined oil equivalent?
- Which document establishes the present buyer and contract interface?
Uncertainties and evidence limits
- Current throughput, field uptime and current consortium percentages are not verified here.
- The retained CNPC report is historical operator-reported evidence, not independently verified output. Fresh retrieval timed out on 22 November; this is not a 404, retraction or basis to convert its combined annual figure to a current crude-only rate.
- No current procurement opportunity or award is established.