Field identity and who does what
Rumaila lies west of Basra. The operator describes northern and southern domes within one extensive field. Its regional reference marker is a navigation aid, not the outline of either dome. R2
Rumaila Operating Organisation (ROO) operates the field. Its website identifies a technical service contract involving Basra Oil Company, Basra Energy Company Limited (BECL) and SOMO. BECL is a PetroChina–bp joint venture. These roles should not be collapsed into a single assertion that a shareholder owns or directly operates the field. R1
What the dated evidence establishes
ROO’s history records commercial production beginning in December 1954, a renewed partnership in 2010, and BECL’s formation in June 2022. The same undated history page reports an average of 1.37 million barrels per day for calendar 2025. That is an operator-reported annual average, not a current capacity guarantee or a November 2026 daily measurement. R3
The field overview describes mature sandstone and carbonate reservoirs and pressure-management needs in the Mishrif reservoir. This is evidence of a complex, continuing field-management task; it is not an announcement of a specific new procurement package. R2
How to use this record
For a commercial reader, the first distinction is between the field operator, the contractual participants and the party issuing a particular requirement. Establish the actual contracting entity before evaluating registration, technical qualification, delivery obligations or payment terms. An industry announcement cannot substitute for the governing contract.
Read annual output, installed infrastructure and future plans as different evidence categories. A larger historical production figure does not establish spare capacity, the timing of new work or a confirmed supplier opportunity. Keep the observation period beside every number when preparing an investment or procurement note.
Questions before acting
- Which legal entity is issuing the actual requirement?
- Does a quoted production figure refer to an annual average, a daily observation or a target?
- Are delivery and site-access requirements documented for the specific scope?
Uncertainties and evidence limits
- ROO pages do not state a publication date; they were retrieved on 15 November 2026.
- No current daily production, current tender award or precise field boundary is certified by this dossier.