A national-operation baseline
Iraq’s EITI report records the end of the Shell/Petronas arrangement and Basra Oil Company’s assignment to develop Majnoon, effective 30 June 2018. This establishes the historical handover rather than independently certifying every subsequent contractual change. M1
KBR’s November 2018 release records a BOC project-management and development award made that May for Majnoon in Basra. Anton’s 2025 annual report separately describes its integrated field-management project and infrastructure support during that year. A service contractor’s involvement is not equivalent to ownership of the field or the state’s contractual role. M2 · M3
Redevelopment discussions: what remains open
Al Hadath reported a ministry spokesperson’s September 2026 account of technical discussions with ExxonMobil. Scope, staging, infrastructure, targets and cost details were described as unresolved. This is attributed reporting about discussions, not an executed development contract inspected by ASHUR. A hoped-for October outcome does not prove that an agreement subsequently occurred. M4
The latest dated primary operational evidence retrieved for this dossier covers 2025. It cannot establish current uptime or November output. The public record would improve materially with a subsequent official contract notice and a dated operating update; those are specific evidence gaps, not assumed negative outcomes.
Reading the project as a commercial participant
For a prospective supplier or adviser, separate the continuing operational interface from any future expansion interface. Confirm which organisation is responsible for the particular scope, and whether an instruction comes from a field owner, operator, project manager or service contractor.
Infrastructure support described in an annual report should not be repackaged as a new tender. Evaluate a real opportunity against its own qualification requirements, delivery conditions and documentary responsibilities. The ASHUR links below concern those practical capabilities; they do not imply a Majnoon engagement, privileged information or appointment by any named participant.
Questions before acting
- Is the requirement part of current operations or a prospective redevelopment scope?
- Which party has approval and contracting responsibility?
- Has a planned milestone been independently confirmed as completed?
Uncertainties and evidence limits
- No completed new operating transfer or definitive redevelopment award is verified here.
- November 2026 production and contractor scope changes remain unverified.
- A project-management or maintenance role does not establish field ownership.